Vahkovich I. System of economic methods of optimization of construction

Українська версія

Thesis for the degree of Candidate of Sciences (CSc)

State registration number

0404U002317

Applicant for

Specialization

  • 03.07.08 -

19-05-2004

Specialized Academic Board

Д 26.056.03

Kyiv National University of Construction and Architecture

Essay

The common calendar model of construction of objects of the enterprise project (CCMCEP) was put in a basis of work. Due to the properties it can in the best way take into account the incorporated needs of the customer and contractor. Its design allows to develop set of variants CCMCEP and to choose best. The developed principles of account of the demand line of credit allow to achieve essential reduction of a payment for the credit, and establishment of necessity of prime repayment of the credit, instead of the debts on percуnts for the credit (contrary to accepted of the order in bank system) allow in addition it to reduce. The significant role is played by the developed technique of definition of the specifications of parameters of statistical model of organization of construction of separate object

Files