Dorokhov A. Lowering dynamic overloads about the purpose of reliability of augmentation of induction generators of wind turbines operating in bridge with a network

Українська версія

Thesis for the degree of Candidate of Sciences (CSc)

State registration number

0405U002296

Applicant for

Specialization

  • 05.09.01 - Електричні машини і апарати

12-05-2005

Specialized Academic Board

Д 64.050.08

National Technical University "Kharkiv Polytechnic Institute"

Essay

Object of study - connecting and working processes in wind turbine generator, as systems including induction generator, activate and, protectors in itself wind turbine Subject of studies. - striking currents and moments induction generator under parallel work with the network, parameters generators with provision for harmonicas of velocity winds, stability induction generator wind turbine generator to weather influences. Methods of study - modeling of connecting processes on induction generator wind turbine generator on PC. Experimental study of states working induction generator. Restriction is reached by including a generator through additional resistances, or use alternating connecting the phases generator to network. Due to this manage to obtain a reducing a striking current in 1,5 times, but moment in 2 times. Designed device realizing alternating connection of phases of generator to network. Introduced in Design Agency of State Enterprise Kharkov Electromechanic Plant. Energy of winds.

Files

Similar theses