Shevchenko V. Geomechanical basis for safe extraction of panels during pillar forming

Українська версія

Thesis for the degree of Candidate of Sciences (CSc)

State registration number

0404U001084

Applicant for

Specialization

  • 05.15.11 - Фізичні процеси гірничого виробництва

05-03-2004

Specialized Academic Board

Д 08.188.01

Institute of Geotechnical Mechanics named by N. Poljakov of National Academy of Sciences of Ukraine

Essay

When rate of longwall face advance exceeds 100 m per day, critical dimension varies between 0.17 and 0.31 of mining depth. Microseismic emission increases 2-4 times and gas emission rises up to 18-50% after destruction of the pillar when its dimension becomes critical. First act of pillar destruction has been followed by 2-4 consequent acts however additional gas emission was registered during 1-2 consequent acts. It means that excessive gas manages to escape from the pillar during first 2-3 acts of destruction.