Salli S. Ground of parameters determining expedience of revision of supplies of anthracitic mines

Українська версія

Thesis for the degree of Candidate of Sciences (CSc)

State registration number

0408U000220

Applicant for

Specialization

  • 05.15.02 - Підземна розробка родовищ корисних копалин

21-12-2007

Specialized Academic Board

Д 08.080.03

National Technical University Dnipro Polytechnic

Essay

Dissertation is devoted to the issue of the day of management by parameters determining efficiency of technological charts of revision of remaining supplies of mines with the considerable terms of service. It is set in dissertation work, that for the receipt of complex estimation of the state and potential of technological chart of mine it is necessary to take into account along with complication of underground economy, by age of mine and its power also technological reliability of basic production links as basic users of investment facilities. It is proved, that for the receipt of complex estimation of the state and potential of technological charts of the coal mining of separate mine it is necessary to take into account the "cost" of parameters of working off in the process of the address investing with the purpose of construction of complex model of optimization of increase of power. It is proved, that the use of the special matrix field enables in number to estimate potential of technological charts. For this purpose 4 groups of backlogs are selected and on the basis of measuring of deviations from the set level it is possible to forecast and correct the aims of mine. Estimation by family of the special curves of degree of comparative investment risk on saving of group of old mines is the important feature of forming of technical policy of the coal mining, where the valuable sorts of coal are obtained. With the purpose of determination of reliability of the "cleansing longwall system" the explored maximum mode, at which the value of index of the use of machine time and influencing of the element "layer" on reliability of cleansing coulisse at planning is determined productivity of longwall.

Files

Similar theses