Aftaniuk О. Multi-criteria Assessment of Project Decisions under Probabilistic and Fuzzy Work Breakdown Structure

Українська версія

Thesis for the degree of Candidate of Sciences (CSc)

State registration number

0414U000064

Applicant for

Specialization

  • 05.13.22 - Управління проектами та програмами

25-12-2013

Specialized Academic Board

К 35.874.02

Lviv State University of Life Safety

Essay

The dissertation is dedicated to the methodology of project decisions and grounding of the elaborated method of multi-criteria assessment of efficiency of project decisions under uncertain work breakdown structure of probabilistic and fuzzy nature at the initialization phase of project. Realizing the elaborated method as a sequence of four steps in probabilistic and fuzzy statements includes: formalizing the uncertain WBS and identifying the corresponding characteristics of its work packages, structurally analyzing the project with the WBS with uncertain links, assessing the reliability of target indexes of project, optimizing the efficiency indexes of project.

Files

Similar theses